In the process of preparing for concrete work, we found an original coal shoot with a huge beautiful piece of limestone. Unfortunately, it was surrounded by structural stone, so we were unable to take it out. We covered it with dirt and plastic before the concrete was poured in an attempt to salvage the limestone. We are hoping to go back in a some point to undermine it out of its current location to use for something decorative in the building.




The sub flooring almost complete in the first floor. It is nice to finally have progress that makes the building look better.