Sunday, June 27, 2010

Cabinets




Our cabinets were moved into the building. The finish carpenters have begun to hang cabinets throughout the office.

Thursday, June 24, 2010

Floors, Floors, Floors
















The office will be finished with several types of flooring. The front entrance is 12x24 tile laid in a brick pattern. The front desk is surrounded with a circle of maple hardwood on the diagonal.





The staff bathroom and mechanical room have solid serface material. The remainder of the office will be carpet.

Wednesday, June 23, 2010

The Lobby is Coming Together











The front windows will be finished with a knee wall that borders the entire interior of the lobby. We will use this wall for additional seating space and display space. The structure for the knee wall is in place and ready to be finished.


Tile has been laid in the lobby entrance, and the lining paper is in place for the hard wood floor surrounding the front desk. This all means that we are very close to opening the doors for business!

Saturday, June 12, 2010

We're Making Things Pretty




The walls are painted with a neutral two tone concept. The walls will all have a chair rail of natural maple to divide the two colors. The curved wall behind the front desk is slightly darker than the top color.


Our front desk is up and almost finished. The top of the front desk will be stone slabs to match the limestone on the front of the building.

Friday, June 4, 2010

Dropped Ceilings







The exam and lab rooms will feature dropped ceilings. The grid for the new ceilings is installed, and a few of the tiles are in place. All of the lights need to be wired in place, so the remaining tiles will be installed closer to completion.